Half a million residents. More than a million hotel guests a year. Three international cables, all landing on the same beach. The first stop on our route is the Cabo Verde telecom market. Cabo Verde (Cape Verde) is an Atlantic archipelago with more subsea cables than most countries its size, and a network that still depends on a single point in Praia.
In 30 seconds
- Well connected to the world, fragile inside: WACS, EllaLink and SHARE all land in Praia and are run by CV Telecom. The rest of the islands hang on an ageing inter-island ring.
- A duopoly: CV Telecom (Alou) has 68% of SIMs and Unitel T+ 32%.
- Fixed broadband is still small and almost half of it runs over copper.
- Starlink arrived in December 2024 but has just 0.64% of connections.
- Tourists are the stress test: up to 19,200 at once, mostly in Sal and Boa Vista.
Cabo Verde in numbers
estimated population (2025)
hotel guests in 2025 (+6.0%)
international cables, all landing in Praia
mobile operators: CV Telecom and Unitel T+
fixed broadband connections per 100 people
of data connections are Starlink
A small country that fills up with tourists in winter
Cabo Verde had 491,233 residents in the 2021 census, and more than half live on Santiago, home to the capital, Praia. But tourists go elsewhere: in the first quarter of 2026, almost four in five hotel guests stayed in Sal and Boa Vista, two sun-and-beach islands with large all-inclusive resorts.
Where hotel guests stay · Q1 2026
Hotel guests: INE, Q1 2026. Residents: 2021 census. Fogo, São Nicolau, Maio and Brava together account for around 1% of guests.
For a network, the annual total matters less than how many people are there at the same time. In the high season (October to March) about 19,200 tourists were staying at once in Q1 2026, and about 14,200 in Q2. In Sal that means a third more users than residents; in Boa Vista, almost half as many again.
Three cables to the world, a single landing point
Cabo Verde is connected by three international cables on different routes. The catch: all three land at the same station in Praia and are run by the same operator, CV Telecom.
International cables
WACS
Europe and the west coast of Africa, down to South Africa.
EllaLink
Sines (Portugal), Madeira and Fortaleza (Brazil).
SHARE
Dakar (Senegal), 720 km, 16 Tbps design capacity.
International redundancy
Medium
Inter-island redundancy
Low
The legacy Atlantis-2 cable was disconnected in January 2022. In 2020 the regulator ordered CV Telecom to open the Praia landing station to Unitel T+.
The weak point is inside the country. The other islands depend on an inter-island submarine ring with sections at the end of their useful life. CV Telecom is renewing it (the CSII-4 project: six sections and some 750 km of cable, around €80 million, €37 million of it from the European Investment Bank), but it is not finished yet. On 10 November 2026 a fire showed how fragile it is.
The Mindelo fire · 10–11 November 2026
- 10 NovemberA fire hits CV Telecom’s station in Mindelo (São Vicente).
- ImpactFogo and Brava lose service (Brava for about 16 hours). Outages in Santo Antão and São Vicente, and in mobile and fixed services in Sal and Boa Vista.
- 11 NovemberService is restored everywhere.
Since March, Fogo has also depended on a detour via São Vicente and Brava because the Santiago–Fogo cable is faulty.
Three projects could change Cabo Verde’s role in the Atlantic:
Lisbon–São Paulo corridor with DE-CIX
Letter of intent signed with CV Telecom in September 2026 for a South Atlantic interconnection corridor via Cabo Verde.
Amílcar Cabral cable (ECOWAS)
3,555 km to The Gambia, Guinea-Bissau, Guinea, Sierra Leone and Liberia, connected to EllaLink. Phased rollout approved in March 2026.
Branch to Google’s Equiano cable
Included in the EIB-backed project that is renewing the inter-island ring.
A duopoly with a dominant operator
State-owned CV Telecom, which sells under the Alou brand since 2023, holds two in three SIMs and almost all fixed telephony. Unitel T+, owned by Angola’s Unitel since 2012, is the challenger.
Mobile market · March 2026
active mobile SIMs
of data connections are mobile
per GB in local data bundles
Source: ARME. CV Telecom also has 72% of data connections.
5G is on its way. The Government approved a National 5G Strategy in February 2026, and CV Telecom has been running a 12-month pilot at the Praia TechPark since April. A commercial launch is expected in 2027 or 2028.
Fixed broadband that still depends on copper
Fixed broadband is growing fast (+12.9% a year) but from a low base: 51,020 connections in March 2026, about 9.7 per 100 people. Almost half the lines still run over xDSL.
Fixed connections by technology
Sample tariffs · 150/75 Mbps
| Operator | Plan | Per month |
|---|---|---|
| Alou | Net Fast Base | €29.01 |
| Unitel T+ | Casa+ Modular (fibre) | €31.74 |
| Alou | 3P Fast (fibre, TV and voice) | €45.34 |
Source: ARME (March 2026) and operator websites (November 2026). The Cabo Verde escudo is pegged to the euro.
Starlink has arrived, but remains marginal
The regulator, ARME, authorised Starlink in October 2024 and service started in December 2024. Almost two years later it has about 3,300 connections, 0.64% of the total. A dedicated framework for satellite services was out to public consultation until August 2026 and has not yet been published.
Starlink in Cabo Verde
start of service
connections (March 2026)
standard kit at launch (Mini: €181)
per month, residential plans
Why resort Wi-Fi saturates in the evening
Cabo Verde is not part of the EU’s roam-like-at-home area, so European visitors pay for roaming, buy an international eSIM or get a local SIM. The local option is by far the cheapest per gigabyte.
What a visitor pays per GB
Morabeza local eSIM (Unitel T+)
Alou local SIM
international eSIMs
Peak-hour demand in high season (estimate)
In-house estimate: 2 to 6 GB per tourist per day, 10% of traffic in the peak hour. Bars show the high case.
After dinner, every guest does the same thing at once: series, social video and video calls home. That traffic has to travel over the inter-island ring to Praia. When the hotel Wi-Fi saturates, part of the demand jumps to the mobile sites around the resort. For international eSIM providers, the margin is also tight: many of them ride on the Unitel T+ network, and the local operator only earns the wholesale rate.
Cabo Verde vs the next stops
The first three stops
| 1 · Cabo Verde | 2 · Ascension | 3 · Saint Helena | |
|---|---|---|---|
| Int. cables | 3, one landing point | 0 (since 1993) | 1 (Equiano branch, 2023) |
| Mobile operators | 2 | 1 (public) | 1 (Sure) |
| Starlink | Since Dec 2024 | Residential since Jul 2026 | Not allowed |
| Tourists at once | ≈14,000–19,000 | No conventional tourism | ≈110–200 |
What’s next for the Cabo Verde telecom market
Cabo Verde has more cables than most countries its size. Its resilience, however, depends on one station in Praia and an ageing inter-island ring.
The duopoly and CV Telecom’s control of the landing station shape wholesale prices, and Starlink has not yet changed the market. The projects under way in 2026 (the ring renewal, 5G, the DE-CIX corridor and the Amílcar Cabral cable) will decide whether the country moves from transit point to regional hub.
Have more recent data? If you work in the sector in Cabo Verde or see something that needs correcting, write to us and we will update the analysis.
Full report
Want the complete Cabo Verde analysis?
This post is a summary. The full report goes deeper, with all the data, tables and sources behind this analysis.
Request the full reportFill in the form and mention “Cabo Verde report” in your message. We will send it to you by email.
Around the World in 60 Islands
Next stop: Ascension.
An island with no international cable since 1993. Follow the route to see how it connects to the world.
Stop 1 of 60 · Two analyses a week
Main sources
- ARME market data, March 2026: mobile, data connections and Starlink, fixed broadband
- INE tourism statistics: hotel guests 2025, Q1 2026 by island
- Cables: EllaLink, SHARE, Praia landing station, EIB inter-island ring project
- Mindelo fire: Balai (Brava), Balai (Fogo)
- Projects: DE-CIX corridor, Amílcar Cabral cable, 5G pilot
- Starlink: launch, satellite consultation
- Visitors: Morabeza eSIM, eSIMDB comparison
Full analysis with 75 sources, consulted on 19 and 20 November 2026.

